
Toronto Transit Commission Electric Bus Pilot
Timeline: 2018 onwards. TTC undertook the largest Battery-Electric-Bus (BEB) pilot project in North America with a fleet of 60 BEBs from three different vendors spread over three garages. The project…
Timeline: 2018 onwards. TTC undertook the largest Battery-Electric-Bus (BEB) pilot project in North America with a fleet of 60 BEBs from three different vendors spread over three garages. The project…
Timeline 2016-2020. Significant upgrades were undertaken such as Line 1 subway extension into Vaughan, in York Region. The 8.6-kilometre extension from Sheppard West to Vaughan Metropolitan Centre ope…
Timeline: 2016 onwards. Region of Peel have a fleet of approximately 500 vehicles equipped with AVL which can be used to track vehicles and generate reports for the fleet. Fleet Idling, Fuel Consumpti…
Timeline: 2020 onwards. The installation of EV charging stations is one way that the Region of Peel has taken action on climate change by reducing greenhouse gas emissions and helping build a greener,…
Timeline: 2016 onwards. The city of Oshawa has 26 public charging station ports (Level 2 and Level 3) within 15km. 20 ports are Level 2 charging ports and offer free charges for electric cars.
Timeline: 2016-2020. MiWay has successfully completed its first five year plan (2016-2020) which focused on moving Mississauga’s transit system from a design that radiates from the city centre to a gr…