• Skip to primary navigation
  • Skip to main content
Clean Air Partnership

Clean Air Partnership

Fostering Sustainable Cities

  • Projects
  • Resources
  • Events
  • Blog
  • About
  • Connect

Burlington – Hybrid Air Source Heat Pump Installation

February 22, 2023 by

Timeline: 2021 onwards

The Heating, Ventilation and Air Conditioning (HVAC) system at the downtown transit terminal was replaced and now consists of a high-efficiency gas furnace and a cold climate air source heat pump. The system was commissioned in late 2021 the City has since been enjoying significant reductions in emissions.

Learn more Explore more actions


Municipality: Burlington

Action: Retrofitting commercial buildings

Category: Buildings



Atlas home

Clean Air Partnership

75 Elizabeth Street
Toronto, Ontario M5G 1P4


416-460-6320
cap@cleanairpartnership.org

  • Follow on Linkedin
  • Follow on Twitter
  • Follow on Vimeo
  • Follow on Instagram
Donate

Subscribe

Name
This field is for validation purposes and should be left unchanged.